Skip to content

fix: #15027, #25379. incorrect cluster cache caused not managed proje… #50160

fix: #15027, #25379. incorrect cluster cache caused not managed proje…

fix: #15027, #25379. incorrect cluster cache caused not managed proje… #50160

Triggered via pull request January 13, 2026 02:14
Status Cancelled
Total duration 8m 2s
Artifacts

ci-build.yaml

on: pull_request
Build & cache Go code
3m 37s
Build & cache Go code
Build, test & lint UI code
1m 33s
Build, test & lint UI code
Ensure Go modules synchronicity
21s
Ensure Go modules synchronicity
Lint Go code
4m 17s
Lint Go code
Check changes to generated code
5m 41s
Check changes to generated code
Matrix: Run end-to-end tests
Run unit tests for Go packages
3m 51s
Run unit tests for Go packages
Run unit tests with -race for Go packages
3m 51s
Run unit tests with -race for Go packages
E2E Tests - Composite result
3s
E2E Tests - Composite result
Process & analyze test artifacts
0s
Process & analyze test artifacts
Fit to window
Zoom out
Zoom in

Annotations

17 errors
Lint Go code
issues found
Lint Go code: test/e2e/fixture/cluster/actions.go#L174
a.context.name undefined (type *Context has no field or method name, but does have method Name) (typecheck)
Lint Go code: test/e2e/fixture/cluster/actions.go#L168
a.context.name undefined (type *Context has no field or method name, but does have method Name)
Run end-to-end tests (v1.31.0, false)
Canceling since a higher priority waiting request for Integration tests-refs/pull/25618/merge exists
Run end-to-end tests (v1.31.0, false)
The operation was canceled.
Run end-to-end tests (v1.34.2, true)
Canceling since a higher priority waiting request for Integration tests-refs/pull/25618/merge exists
Run end-to-end tests (v1.34.2, true)
The operation was canceled.
Run end-to-end tests (v1.33.1, false)
Canceling since a higher priority waiting request for Integration tests-refs/pull/25618/merge exists
Run end-to-end tests (v1.33.1, false)
The operation was canceled.
Run unit tests with -race for Go packages
Canceling since a higher priority waiting request for Integration tests-refs/pull/25618/merge exists
Run unit tests with -race for Go packages
The operation was canceled.
Run unit tests for Go packages
Canceling since a higher priority waiting request for Integration tests-refs/pull/25618/merge exists
Run unit tests for Go packages
The operation was canceled.
Run end-to-end tests (v1.32.1, false)
Canceling since a higher priority waiting request for Integration tests-refs/pull/25618/merge exists
Run end-to-end tests (v1.32.1, false)
The operation was canceled.
E2E Tests - Composite result
Process completed with exit code 1.
Integration tests
Canceling since a higher priority waiting request for Integration tests-refs/pull/25618/merge exists